MrWilko99
MrWilko99's Channel
 
 
DB 60066 On 6H52 @ Woodend Lane 11/2/22
66
 
Best Of 2022
Best Of 2021
Strines
XC Diverts
Stockport
Denton & Ashton
Prestbury
Poynton
Alderley Edge
Chinley
Mobberley
Dore & Totley
Sheffield
Alexandra Street
Guide Bridge
Romiley
Disley Tunnel
Marple Aquaduct
Crewe
Woodend Lane
Chinley East Jn
New Mills South Jn
Chelford
Hyde Bank Farm
Poleacre Lane
Woodley
Hyde Central
Apethorn Lane
 
MrWilko99
Your channel viewers will see links here, including "subscribe" and "add as friend".
Profile
 
Name
MrWilko99
Description

Subscribers
524
Subscriptions
Friends
Channel Comments
jonathan.schivaura3409 (9 months ago (edited))
Workhorse Class 66
basiltaylor8910 (1 year ago)
Sounds like my new AEG washing machine on Fast Spin, not enamoured of Sheds, they do the job but a soulless bag of shit, bring back the Grids.
DjFatBoi-x4x (3 years ago)
I can tell, that driver forgot to deactivate the direct brake and is over stressing the engine to shit, or he didn’t charge his airbrake up OR he didn’t turn of his parking brake
stuartriches2551 (3 years ago)
What's in the trucks is it murdered trees?
laszlofyre845 (3 years ago)
Amazing what waiting for the airflow to drop and an overcharge can do, eh?
leonblittle226 (3 years ago)
Class 66 proving they are not up to the job that a class 60 can handle and never have been. The 60s get awful temperamental if they don't get maximum maintenance treatment though.
michaelmoran1964 (3 years ago)
Need a Class 60
davidlyon2690 (3 years ago)
over charge the brake pipe, put it in slow speed and give it power, full power.
t20turnaround49 (3 years ago)
Do these 66 class have DC traction motors, if so treating them like that will be really good for them.
DOCTORDROTT (3 years ago)
I would guess that the train brake needed overcharging which boosts BP to over 5 bar. Then that resets the distributors in the wagons as the overcharge bleeds off therefore getting full brake release. Got called out to this type on incident many times. On one heavy train of stone stuck in the Severn tunnel we had to get the failed engine restarted to get the 2500 tonne of stone train moving up the bank. It held till we got to Patchway and then we were OK to Avonmouth all down hill
TheDoihaveto (3 years ago)
Hate to guess how many gallons of diesel used getting that load moving.
maj0072 (3 years ago)
Take parking brake off helps. To me that looks like a 2 engine pull. Even with the brakes issue sorted it still had to work extremely hard to get moving.
stephenrice4554 (3 years ago)
To my ear it sounds like there's a brake problem , a shed should pull a rake without this fuss and bother
dackesjulag (3 years ago)
Luckily its a dry rail..
macjim (3 years ago)
Goes better with the handbrake off
AndreiTupolev (3 years ago)
Wait, 12 hours? How long did it take to find a rescue loco? There would seem to be a passenger service on this line. What happened with that?