Your channel viewers will see links here, including "subscribe" and "add as friend".
Profile
Name
MobileRailSpotterRxR
Description
Your go to channel for trains & railroad crossing and zooming in on light detail of crossing lights.
Camera's
Sony FX30 π₯πΈ
Canon R50V πΈπ₯
Samsung Galaxy S26 Ultra π€³π₯π·
Camera's
Sony FX30 π₯πΈ
Canon R50V πΈπ₯
Samsung Galaxy S26 Ultra π€³π₯π·
Subscribers
168K
Subscriptions
Recent Activity
|
MobileRailSpotterRxR
November 17, 2026
Pictures 1 - 3, I haven't filmed this crossing on Dupont St on the VTA Green Line/UP Vasona Branch in San Jose, CA since 2015, 11 years ago and since I did, this crossing has gotten a new vehicle radar detection system for the exit/quad gates here basically, an signal function upgrade from the last system this crossing had. Also, the closest gate WCH E-Bell was replaced with a new one too after the old one died.
Picture 4, A gate was hit by a vehicle and being fixed at the Auzerais Ave crossing on the VTA Green Line/UP Vasona Branch in San Jose, CA.
Picture 5 & 6, Since I last filmed here in 2021 here at the 1st Ave crossing here on the Caltrain Peninsula Sub in San Mateo, CA, minor changes have happened to its pedestrian gates and also new RECO Low Profile Gate LED single light on the close pedestrian gate. Also, the GS Type 1 E-Bell here on the eastern shoulder signal is leaning now unfortunately.
------------------------------------------------------------------------
Taken November 16, 2026
Pictures 7 & 8, The stop signs were removed from the wayside of the freight track at the Mine Shaft Ln Crossing on the SACRT Gold Line and UP Placerville Branch in Rancho Cordova, California. It means they fixed the freight track circuit problem and turned detection for it back on but I don't know if they did a definitive fix to stop the random activation malfunctions caused by the freight track circuits. They basically just put the freight track circuits back in service since the Mine Shaft building will be sitting empty again since October ended and the Heartstoppers Haunted House is gone till next October.
They had the track circuits for the freight track only here turned off due to its unpredictable malfunction sequence that keeps the gates stuck down and didn't want the Heartstoppers attendees to get stuck inside the property as it's one way in and one way out through the crossing and the chance of the gate getting stuck down was a hazard as cars will try to drive around after waiting where you have a active light rail line also could have pose a potential accident all caused by gates being stuck down.
|
||
|
MobileRailSpotterRxR
November 12, 2026
Picture 1 - 3, I had found out from a post that the median signal here at the Jefferson Blvd crossing in West Sacramento, CA on the UP Holland Branch section of the SERA Line previous median signal which was a knockdown replacement back in 2019, was recently hit itself being the second knock down in the same spot occurred sometime between August and October 2026 with a new UP mid 2020s era Siemens Signal install being its replacement. Unfortunately, I won't film this crossing again for a while still as since this is just tail track use for the Sierra Northern Railway now, they don't come back here too often and it's not predictable when they do although they do. It's the same reason why I haven't filmed a video of Harbor Blvd with its WCH E-Bell but just a short video I caught in my spare time catching them back here. The other 3 mechanical bells are still surviving here. Note the new signals bell is mounted on its back side instead of being mounted on the side.
The very last time I filmed this crossing and previous median signal:
https://youtu.be/ltYDpU6U8M8
The last time I filmed the original median signal here before the previous signal replaced it:
https://youtu.be/z-SieODilzY
------------------------------------
Picture 4 & 5, The F St crossing on the SERA Connection Track in West Sacramento, CA had its counterweight arm fixed on the eastern signal. Unfortunately, I won't be able to film this crossing for some time as the train only runs through here at night being the UP Folsom Turn. Everything else is the same.
------------------------------------
Picture 6, A look at E St in West Sacramento, CA crossing in the SERA Connection Track. Apartments and new roadways were built in the background. Also the gates got new gate LEDs here since I last filmed. Unfortunately, the train only runs at night here. Much of West Sacramento, I really don't film much anymore due to railroad changes from PSR and other reasons also.
------------------------------------
Picture 7, Construction going on, on 3rd St at the crossing on the UP Martinez Sub in West Sacramento, CA. This is an underground utility construction or the Washington District Infrastructure Project. Not really railroad construction.
------------------------------------
Pictures 8 & 9, The 16th St crossing on the SACRT Gold and Blue Line in Sacramento, CA bell on the right mast cantilever still isn't ringing either dead or indirect disconnection in the signal.
------------------------------------
Picture 10, Construction going on at the Broadway Station on the SACRT Blue Line in Sacramento, California. The station is closed till the 22nd of November unless completed a few days early.
-------------------------------------
Also, near the Meadowview Station, there was signal work going on around the wayside aspect signals north of the stations. Likely signal work related to the new foundations. Have to check CRC eventually too.
|
||
|
MobileRailSpotterRxR
Forgot to include in the title of this video that there are new E-Bells here at California Dr on the Napa Wine Train Line.
|
||
|
MobileRailSpotterRxR
Taken November 10, 2026
Picture 1 - 3, Laurel St railroad crossing on the CFNR West Valley Sub in Arbuckle, CA with its new RRSC-ET "RSI" LEDs replacing incandescents since I last filmed this crossing. These were installed sometime around July/August.
Picture 4 & 5, CR 68 on the CFNR West Valley Sub had its RACO Bell fixed.
Picture 6 - 8, Delevan Rd on the CFNR West Valley Sub remaining incandescent side lights on the right signal has had them replaced with new Electro-Tech LEDs to match the main lights. All lights were changed to LEDs on each signal but the close signals side lights remained incandescent until now.
Also I have no picture, but when I passed Lenahan Ln Maxwell, it's Safetran Hybrid Bell was replaced with a new GS Type 3 E-Bell. Also, the Corning job didn't go south of Delevan this day so I didn't get the chance to film the updates at Lenahan Ln, Central St, and at Fairview.
|
||
Friends (12)
Channel Comments
There are no comments for this user.
Add comment



![Railroad Crossing's With Double Overhead Cantilevers Towers On One Side Compilation [4K] Railroad Crossing's With Double Overhead Cantilevers Towers On One Side Compilation [4K]](https://i.ytimg.com/vi/nmeBxLoEZPA/hqdefault.jpg)





































































